Two cranes were available for unloading at the Jack Fish docks. The first crane (in the foreground) could move back
and forth while the crane in the background was stationary and could only unload a few hatches unless the boat was moved. Whenever a Laker
arrived with a load of coal, the unloading ran continuously until completed. Jack Fish supplied the coal chute at Schreiber, Jackfish, and White
River. Coal for the remainder of the Schreiber Division came from Britt, near Byng Inlet on Lake Huron - Date unknown Photographer unknown.
|