24 April 2009
Davenport Diamond Project Information
The Davenport Diamond.
Toronto Ontario - GO Transit is studying the
various options for alleviating train capacity constraints through the Davenport Diamond rail crossing in the City of Toronto.
One of the alternatives being considered is a rail-to-rail grade separation, involving bringing CN
north-south tracks (on which GO runs its Barrie-Bradford service) either under or over CP's
east-west tracks. These tracks intersect near Dupont St. and Landsdowne Ave. in Toronto.
Alleviating the capacity constraints at this location will allow GO to increase service on the Barrie-Bradford line, and
to eventually introduce all-day train service.
|
|