Trains depart and arrive from Furnace Sidings station with the first stop being the Whistle Inn Halt at the northwest end of the line. From here trains reverse past Furnace Sidings to the Blaenavon High Level station. The Whistle Inn is a short walk with their parking lot visible behind the halt.