Not your average passing siding! And not really a switch but the siding is operated by the use of this transfer table type switch at the upper end of this two track passing siding. One wonders how this table would function during the winter months. The railway operates from mid-May to November so the table probably wouldn't be worked under extreme temperature or snow conditions. This is the Pilatus Bahn which utilizes the
due to the very steep 48 percent grade.