New York New York USA
Washington District of Columbia USA - Canadian Pacific Kansas City (CPKC) on 12 Dec 2022 petitioned
the Federal Railroad Administration (FRA) for a modification of an existing waiver of compliance providing the Class I
"limited, conditional, relief" from certain provisions of the Federal railroad safety regulations contained
at 49 CFR parts 215 (Railroad Freight Car Safety Standards) and 232 (Brake System Safety Standards for Freight Car
Safety Standards for Freight and Other Non-Passenger Trains and Equipment, End-of-Train Devices), according to a notice
in the Federal Register's 7 Jun 2023 edition.
Additionally, CPKC requested certification under section 415 of the Rail Safety Improvement Act of 2008 (RSIA), that
"brake inspections conducted in Mexico meet FRA requirements."
FRA notes that CPKC's request under RSIA Section 416 will be "handled separately from its waiver modification
request and accordingly this notice only addresses CPKC's request to modify the existing waiver in Docket Number
FRA-2007-28700."
Specifically, in its petition, CPKC requests a modification of the existing relief in Docket Number FRA-2007-28700
involving 49 CFR 232.205, Class I brake test, initial terminal inspection, and certain provisions of 49 CFR part 215,
regarding freight cars received in interchange from Kansas City Southern de Mexico (KCSM) at the U.S./Mexico border
crossing and international bridge in Laredo, Texas, according to the petition.
CPKC requests that FRA "permit the inspections and brake tests currently required to be conducted at the point of
interchange between CPKC and KCSM and at CPKC's Laredo Yard in Texas to be conducted in KCSM's Sanchez Yard in
Mexico."
In support of its petition, CPKC states that the existing waiver has "contributed to border security and that no
incidents have been attributed to the relief in the past fourteen years."
Additionally, according to the Federal Register, CPKC proposes to implement new technology, Duos Technologies' rip
Railcar Inspection (DTRI) that will:
"Allow FRA to confirm remotely at the time a train arrives at the international bridge that the train has passed
the Class I or Class III brake test in Sanchez Yard, and "Allow CPKC qualified mechanical inspectors to use the
DTRI data to confirm the mechanical soundness of any train interchanged from KCSM to CPKC."
CPKC also explains that "avoiding stopping trains on the Bridge will also reduce the incidence of vandalism to
brake systems that occurs when trains stop on the Bridge waiting to cross into the U.S.," according to the
petition.
Communications, FRA says, received by 7 Aug 2023, will be considered "before final action is
taken."
Comments received after that date will be considered "if practicable."
Carolina Worrell.
(likely no image with original article)
(usually because it's been seen before)
provisions in Section 29 of the
Canadian Copyright Modernization Act.