Prior photo  Thumbnail photos  Next photo
Swinging the camera to the right shows the concrete construction of the Wengen freight terminal. The freight train, led by control car 831, has stopped waiting to be loaded by the fork lift coming down the ramp. The mainline to the station platforms is visible on the right.
 Internal link
 Image