This end of the structure faced the mountain where the tram buckets entered with the ore. Inside the structure were bins where the ore was stored. The tube on the far end was used to slide canvas bags of ore down to the loading dock. The bags where then loaded into boxcars - 12 Jun 2016 Photographer? |