At this point, and near the 10:15 departure time, DFB No. 1 is about to couple with the awaiting cars at Realp station. The whole DFB operation, with the exception of one employee, is handled by volunteers. The catenary visible in the distance between the passenger car and locomotive lies over the twin tracks of the MGB mainline.