Morning steam up for WD 152 is complete at this time so the engine is moved onto the Norchard Low Level platform track to couple up with the awaiting carriages. The engine will handle a five slam-door carriage train over the next few days back and forth along the line. The mainline and route to Norchard's High Level platform is visible immediately above the red semaphore signal. Two men on the left stand on the signal box platform.